Hidden Cove Farm Plan
Ball Ground, Georgia · Pickens County · 40 acresPrepared October 9, 2026

Hidden Cove Farm Plan

Read the land. Rank the work. Run it together.

Sheet 1 · The short version

Find out what is there. Then water, grade and cover around the house and barn, in that order.

The house and barn sit on a spur, a ridge running down from higher ground, that falls southwest at 22 to 30 percent. USDA maps the soil as a thin sandy loam over soft rock, 10 to 20 inches down. Ground like that sheds water fast and is slow to green up once it is cut open. In the newest air photo the cuts made for the build still look bare. I read Bonnie's complaints as one unfinished job: the ground was shaped for the buildings and not yet for the water. So the first money buys knowledge. The next buys water, grade and cover around the house and barn. The other 37 acres get time, goats and one walking trail. I have not stood on the place. This is a desk study, and every line of it is to be checked on foot.

23%Average fall behind the house110 ft down in 471 ft.
15 in.Soil over soft rockUSDA maps 10 to 20 inches of loam on weathered rock. It prices every trench, post and cut.
$71k to $263kThe whole list, low bids to highA plan and three bids narrow that. It is why knowing comes first.
19 of 28Projects paid for at middle prices

This month

  1. Fri Oct 9Call NRCS before the cutoff. NRCS is the USDA office that helps pay for conservation work on farms. Its cost-share program is called EQIP, and the cutoff for its first funding round is Friday, October 9. The directory lists the Calhoun office's district conservationist at (706) 307-7614. The state office is 706-546-2272. Ask three things. Can a place like ours apply? Can you take an application, form CPA-1200, today? When are contracts from this round usually signed? The usual papers are a deed, a tax ID, a farm number from the Farm Service Agency and form AD-1026. Sign-up runs all year, so a later application is not lost. It misses this first funding round.
  2. This weekLook at your tax bill. If it says Pickens, carry on. If it says Cherokee, the county offices named on these sheets change: planning, environmental health, Extension and the tax assessor. NRCS does not change; the Calhoun office serves both counties. The county line runs about 1,000 ft south of the house. If your land crosses it, both counties have a say.
  3. This weekLook at the barn's low side, and book the engineer. Cracks in the slab, posts out of plumb, a bulge or a fresh crack in the slope: any of these, and the engineer comes first, ahead of everything else on this page. If you see none, book the visit anyway. The barn gutters and every dig near the barn wait for that letter, and it decides whether the pens stay beside the barn.
  4. This weekCheck three pins, drag one. The Google Earth file now shows the well, the septic tank and the pens where your words put them, and a power-meter pin still waiting beside the house. I read your words this way: the well at the front corner of the house nearest the entrance, the septic tank at the back corner nearest the barn, the pens on the side of the barn away from the house. If I have left and right backwards, the well sits at the front corner nearest the barn, and the court side of the barn is then only about 69 ft from it. So tape it either way: 100 ft or more from the well casing to the nearest pen fence. Open each pin's properties, drag it if it is off, save the folder, and send the file back in our chat.
  5. This weekFind what is buried. Ask Pickens Environmental Health, 706-253-0900, for your septic permit drawing. Ask where the field and the reserve area run from the tank at the back corner of the house, how far below the field a cut must stay, and what may cross it. The trail and the level yard wait for that drawing. Pull your plat, the recorded survey drawing of your land. Book a private locator for the lines past your meter, and for the water and power that run from the house to the barn. 811, the free call-before-you-dig service, marks only the lines the utilities own. Put in an 811 request now too, so its marks are down before a blanket pin goes in.
  6. By Oct 31Rye and straw on every bare bank. Rake the face so seed touches soil. Spread 10-10-10 fertilizer at about 12 lb per 1,000 sq ft, then cereal rye at 4 lb, then straw at about two bales, thin enough that you still see a little soil. On anything steeper than 3 to 1, use a straw blanket with natural-fiber netting and pin it down. Work only where you can stand; the rest is a hydroseeder's job. Leave standing weeds on the slopes this winter. They are the only cover those slopes have.
  7. This monthAutomate the water with a hose. On the barn's spigot: a tap timer first, a vacuum breaker on the timer's outlet, then a hose to a float valve on a tub at each pen group. Have the plumber check that backflow protection, and that the spigot is frost-free, before the hose goes on. Add timed coop doors and treadle feeders. All of it is project Y2, about $1,800, and all of it moves with the pens. Sheet 6 has the details.
  8. Next hard rainFilm where the water goes. The road above the entrance, the entrance itself, the driveway beside the house, both roofs, the low side of the barn. Film from a porch, a window or the truck. Stay off the slopes.
  9. NovemberWrite to Pickens Planning, 706-253-8850, once the banks are covered. Send the table of ground work from Sheet 7 and ask in writing. Which lines need a land-disturbance permit or a state stormwater notice? Does the county keep Hidden Cove Drive, and who keeps its ditch? What does the access permit at the entrance take? Does the trench need an electrical permit, or any wall a wall permit? Does your zoning allow pigs?

Nine findings that shape the plan

1

The address sits in Pickens County.

The census places it there, and the Cherokee line runs about 1,000 ft south of the house. Your mail says Ball Ground, which is in Cherokee. The tax bill settles it.

2

The soil is thin, dry and quick to wash.

USDA maps Tallapoosa soil here: sandy loam over soft, flaky rock at 10 to 20 inches. It rates this ground very limited for lawns, roads, trenches and fence posts, poor for fill, and its erosion hazard severe. Plan on small lawns, slow digging, and cover on every cut the same week.

3

The water has three sources and two ways out.

On the 2019 ground about 0.8 acre of slope drained onto the yard from above. Two roofs and a gravel yard add their own. The road drops about 37 ft in the 200 ft above your entrance, and part of it sheds onto the bank above your drive. On the 2019 ground the water leaves two ways: down the swale, a shallow dip, between house and barn, and down the hollow below your entrance. Nothing gets built to catch water until that water has been followed to one of them.

4

The barn stands at the head of a swale.

The natural ground fell 23 to 25 ft across the barn's footprint, and the yard's runoff gathers just below it. So part of the barn likely stands on fill. An engineer looks at that slope, and at the cut above the barn, before anyone digs near either.

5

Flat ground is bought with wall.

On a 25 percent slope a 4 ft wall buys 16 ft of level ground. So build flats only where they earn it: one level yard by the house, and ground for pens. Do not terrace the long slope behind the house. Cover it, and cross it on one walking trail.

6

The driveway climbs from the road, likely with the wrong stone on it.

Clean stone of one size never locks, and more of it makes the drive worse. Pick up a handful: no dust, no lock. On the old ground your drive climbs about 18 ft from the entrance to the barn and passes about 50 ft uphill of the house. So its water and the road's meet at the entrance, and none of it may be turned out above the house, where your well stands.

7

The pens lean on the barn's cut and fill.

You told me the pens stand on the right side of the barn; I read that as its east side, away from the house. Your well, at the front left corner of the house, is then about 220 ft away. If so, the 100 ft rule is met. Tape it, because the other reading of left and right puts the well about 69 ft from the barn's court side. On the old ground every side of the barn slopes 24 to 29 percent. The uphill sides shed their water at the barn, and the downhill sides sit on or below its fill. So the engineer's letter decides whether the pens stay. The list is set to Stay, with about $2,800 of fixes for pens that stay. A move runs about $19,000 for tiers and rebuilt pens, and at middle prices it takes the bank's money: the bank falls $7,900 short. The rebuilt pens would also wait for the trench, which is on hold for NRCS.

8

The work sits near the one-acre line.

Work around the house and barn disturbs about 0.6 acre. Add the walking trail and it is about 0.9. Clear ground for a farmyard and it is about 1.3. Past one acre the county and the state both ask for a permit unless a farm exemption applies. That is one more reason to test the pens before moving them.

9

The back slope likely holds your septic field.

You told me the tank sits at the back right corner of the house. The field most likely lies on the slope below it. The trail line as drawn starts about 55 ft from the back corners, and about 430 of its 1,089 ft lie in the first 200 ft of slope below them. So the trail, the level yard and any digging behind the house wait for the county's drawing. Grass, cut on foot, is the right cover meanwhile.

What $100,000 reaches

The list on Sheet 4, taken in order, at the prices that sheet is set to. Projects under $10,000 are gathered into one step. Read down the running total: the line between what is paid for and what waits falls where it passes the money to spend. Rows on hold for NRCS take no money until they are released, so they carry no running total.

StepWhatCostRunning totalWhere it lands

The same list, priced three ways. The money stops at the first thing it cannot pay in full.

If the bids come inPaid forSpentFirst thing the money cannot reachShort by

What waits on the list as set: Sheet 4 shows why, and lets you change it.
What you told me on October 9, and what is still unseen. The barn has water and power. The well is at the front left corner of the house, the septic tank at the back right, the pens on the right side of the barn. Still unseen: the pens themselves, your true boundary, the grades as built, where the drain field runs, the lines between house and barn, and who keeps the road. The newest photo is from October 2025. Each gap is an early job on the list, and each can move a project or end it.